Thursday, 7 November 2013

Daxeam version 2.0 Released

POST MULTIPLE WORK ORDERS AT ONCE

Multiple work order can now be posted to projects. This is possible through the periodic function or by simply selecting work orders from the list pages. This function is also available from the activities form.


CREATE WORK ORDER LINE IN SINGLE ACTION

The ability to create a work order line attached to a new work order has been added to the work order line list page, work order line details, engineering asset list page, engineering asset details, engineering asset hierarchy tree and the engineering asset install/remove forms. Simply select the Work order line/Create work order line button from the applicable form.



VERSION 2.0 PERFORMANCE OPTIMIZATION

Performance tests were executed throughout the Daxeam module. The areas included in tests were:

  • Work order processing 
    • Creating
    • Status updates
    • Item picking
    • Item issuing
    • Item returning
    • Feedback
    • Closing
  • Forecasting – e.g. Cyclic forecasts
  • Posting meters on engineering assets
  • Scheduling
  • Reporting

Optimizations were applied based on the results and analysis of performance tests.

ISSUES FIXED

More than 30 issues non-critical have been resolved.

No comments:

Post a Comment